Two things decide the job: how much room your electrical panel has for a new circuit, and how far the panel is from the parking spot. I check both before I quote, so the price covers the real work.
What the job includes
- Check of the panel capacity for a new circuit
- Dedicated 240-volt circuit to the parking spot
- Charger mounted, connected and tested
- Indoor or outdoor installation
What to send for a quote
Send me a photo of your electrical panel with the door open, a photo of where the car parks and the charger model if you already have one.
I cover Hubbardston
My base is Malden and I cover every town within 50 miles. Hubbardston (Worcester County) sits 48.3 miles west of Malden.
Most jobs start with a message: tell me what is going on, add a couple of photos, and I come back with a clear estimate. I am available Monday to Saturday, 7 AM to 7 PM.